SWA PROJECT INFORMATION

AGN 100X PROJECT PROGRESS

CURRENT INFORMATION, PROJECT STATUS, IMPORTANT UPDATES AND RESOURCES

LAST UPDATED: 14 SEPTEMBER 2026

CURRENT PROJECT STATUS

NO PROJECT LAUNCH SCHEDULED FOR SEPTEMBER

Before any launch is possible, we need to correct all pending errors. See the latest SWA newsletter for additional information.

READ THE LATEST NEWSLETTER →

AGN 100X LAUNCH

PENDING

BEFORE YOU PARTICIPATE OR SUBMIT INFORMATION

Incorrect or incomplete information creates delays for the participant, the referrer, the Challenge Team and the entire administrative process.

Please use the information below before submitting new or corrected information.

DO NOT GUESS

If you are uncertain about any information you are being asked to provide, contact your referrer / upline before submitting.

!

REFERRERS — HELP YOUR TEAM GET IT RIGHT

If your direct referral is uncertain about registration, identification, wallet information, TxHash / Transaction ID or any other required information, assist them before they submit.

QUALITY CONTROL STARTS BEFORE SWA RECEIVES THE DATA.
THE CORRECT PROCESS
PARTICIPANT ENTERS
→
REFERRER CHECKS
→
DATA REVIEW
→
SWA PROCESSES

When SWA receives the entered data, the participant and the referrer should already have checked and verified all entered data.

ⓘ
SWA DISCLAIMER

Participation in the AGN 100x project is subject to the Smart Wealth Accelerator Disclaimer and related legal information. Please read and understand the disclaimer before relying on information presented on this page or participating in the project.

READ THE SWA DISCLAIMER

PROJECT PROGRESS

CHALLENGE TEAMS

IN PROGRESS
4 / 6 TEAMS QUALIFIED

Four of the six required Challenge Teams are qualified.

However, many contributors are not staying "active".

PARTICIPANT DATA

VERIFICATION & CORRECTION

Participant information is being reviewed, corrected and reconciled where submitted information is incomplete, incorrect or conflicting.

WHAT SWA IS WORKING ON

CURRENT PRIORITIES

SWA continues to work through participant information, verification issues and the remaining Challenge requirements.

The objective is to correct outstanding information, improve data quality and remove the administrative issues that can be resolved from the SWA side.

NEW SWA REPORTING SYSTEM — VERSION 2.0

The original SWA reporting system was created as an interim solution and has served us well. However, the number of participants, submissions, corrections and verification requirements has grown far beyond what the original system was designed to manage efficiently.

Rather than continuing to invest substantial time and effort expanding and repairing the old Version 1 system, SWA has designed a new Version 2.0 reporting system that is better suited to the size and requirements of the AGN 100x project.

1

PROFILE MASTER DB

The central participant profile containing the core information connected to each individual participant, including contact information, wallet information, referrer information and relevant account statuses.

2

ID VERIFICATION DB

A separate verification area for identification information, documents, review status and the information required for the identification and compliance process.

3

AGN 100X DEPOSIT DB

A separate database for AGN 100x deposit information, including transaction details, deposit information and the data required to review and process each reported contribution.

WHAT THIS WILL IMPROVE

The new structure is designed to make information easier to maintain, verify and correct while reducing repeated manual administration.

Where appropriate, participants may be able to review and edit certain parts of their own information rather than requiring SWA to manually make every correction.

Participants will also be connected to their referrer through the new profile structure, and personalized referral links can be used so that new participants enter through the correct referrer and team structure from the beginning.

The objective is simple: better data in, fewer corrections later, and a system that can support a much larger participant network.

LATEST NEWS & INFORMATION

THE ROAD TO LAUNCH CONTINUES

Read Claes' message to Challenge Team members regarding the current situation, the temporary pause and the work now underway to strengthen our systems and prepare for launch.

READ THE ARTICLE
SWA NEWSLETTER

IMPORTANT AGN 100X PROJECT INFORMATION

Important information regarding the Challenge Teams, participant data verification, the administrative backlog, correction requests and the 48-hour correction process.

ALL CHALLENGE TEAM MEMBERS AND REFERRERS ARE STRONGLY ENCOURAGED TO READ THIS NEWSLETTER IN FULL.

READ THE NEWSLETTER